Detailed project reports and EPC documentation, prepared from the ground up.
We prepare detailed project reports (DPRs) and engineering, procurement and construction (EPC) documentation: scopes of work, schedules of works, responsibility matrices and cost estimates, built from survey data, approvals and compliance records.
AECOSYSTEM prepares detailed project reports and EPC scope documentation for public and private construction projects.
Documentation that holds up.
A DPR or an EPC scope is the document that a project is approved, tendered and built against. It has to be complete and easy to check, and it has to agree with the survey and the approvals. We prepare it with the same discipline we use for software: structured, versioned and traceable to its sources.
What we prepare.
- 01
Detailed project reports
Scope, justification, design basis, cost estimates and implementation plans.
- 02
EPC scopes of work
Chapter-by-chapter scopes for every package of a project.
- 03
Schedules and responsibility matrices
Who does what, and when.
- 04
Cost estimates
Cost-centre estimates priced against the applicable schedule of rates.
- 05
Compliance compilation
Approvals, NOCs, environmental compliance and land records brought into one consistent report.
Who it is for.
How a project runs.
- Stage 01
Discover.
We learn how your projects, sites and teams actually work before we suggest any software.
- Stage 02
Specify.
We write down what the system must do, in plain language and in detail, so that everyone agrees on it before we build.
- Stage 03
Build.
We build in short stages that you can see and use, starting with the part that saves the most time.
- Stage 04
Launch.
We roll the software out to the people who will use it, on the devices they already carry.
- Stage 05
Support.
We keep the system running, measure how it is used and improve it as your company changes.
The technology we use.
We choose widely used, well-documented tools that we already run in our own products, so the system is dependable today and maintainable for years.
- Documents
- Structured drafting
- Excel cost workbooks
- PDF deliverables
- Rates
- CPWD schedule of rates as structured data
Frequently asked questions.
What inputs do you need?
We need survey data and drawings, the schedule of rates the estimate must follow and the approvals and compliance documents you hold. We list the gaps at the start.
Can you work from LiDAR or total-station surveys?
Yes. Survey data is the starting point for site infrastructure and quantities.
Have a project in mind?
Tell us about your company, the problem and the people who will use the software. We will reply with a clear next step.